Furniture and finishes

Furniture belongs in the programme, not on the last page.

Select furniture while the design is still open. Desk sizes, delivery dates and power routes can all change a layout.

Discuss your project
Blue high-backed upholstered booth beside a desk and task chair
Upholstered commercial lounge furniture arranged around a low table
Illustrative study of the materials, spaces and details involved in this work.

How we can help

What the work involves

01

Plan around use

Consider workstation types, meeting settings, storage and informal spaces.

02

Review specifications

Assess dimensions, durability, finishes, lead times and budget suitability.

03

Coordinate the interfaces

Align furniture with power, data, lighting, circulation and installation access.

04

Install and hand over

Coordinate delivery and installation with the wider fit-out programme.

A practical starting point

Planning resources

Start a conversation

Tell us what you're planning.

A brief outline of the location, floor area and programme is enough to begin.

Get in touch

PROJECT NOTE

Furniture is part of the building brief

Plan power, data, clearances, delivery access, ergonomics and maintenance alongside the furniture selection, not after the layout is signed off.